Coping with Boulders in Soft Ground TBM Tunneling

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 17
- File Size:
- 2265 KB
- Publication Date:
- Jan 1, 2001
Abstract
Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper aims to consider the problem as a whole, from the geological characteristics of boulder sites, to the appropriate physical design of theTBM, and its operation in boulder-laden soils. In addition, visualization of boulders and other subsurface obstructions by seismic methods and ground penetrating radar are reviewed. The paper will assist the construction planner in assessing the risks and preparing appropriate specifications.
Citation
APA:
(2001) Coping with Boulders in Soft Ground TBM TunnelingMLA: Coping with Boulders in Soft Ground TBM Tunneling. Society for Mining, Metallurgy & Exploration, 2001.