Crushing And Grinding At The New Sar Cheshmeh Concentrator In Iran ? Foreword

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 48
- File Size:
- 3009 KB
- Publication Date:
- Jan 1, 1976
Abstract
It is felt that prior to the presentation of the technical portion of this paper, some general information would be of interest. The Sar Cheshmeh Copper Mining Company was founded by the Iranian Government to oversee the design and construction of Iran's first copper smelter complex, which will be another step in the industrialization of Iran. Since this is the first such plant in Iran, Sar Cheshmeh wisely chose to enlist the technical assistance needed in regard to the facilities requiring engineering and operating know-how from outside of Iran. To obtain the foregoing, SCCM signed a contract with Anaconda-Iran, Inc., which was formed by The Anaconda Company for this project. The general scope of this contract covers the overseeing of engineering and design by Parsons-Jurden as well as physical plant construction. In addition to this, the same services were given to water supply and tailings disposal systems which were not included as part of the Parsons-Jurden contract. Anaconda-Iran is also assisting SCCM in setting up a training program for Iranian personnel for plant operations, administration, etc., which .will go on for some time after the plant startup, under the guidance of Anaconda-Iran expatriates. SCCM?s other responsibilities, in respect to the development of this industrial effort, are the building of a townsite for approximately 2200 families, the expected manning requirements, having all the facilities necessary to provide a pleasant life in a remote area. It has been estimated that the manpower for operations will be 2050.
Citation
APA:
(1976) Crushing And Grinding At The New Sar Cheshmeh Concentrator In Iran ? ForewordMLA: Crushing And Grinding At The New Sar Cheshmeh Concentrator In Iran ? Foreword. Society for Mining, Metallurgy & Exploration, 1976.