Current Operation at La Caridad Smelter

The Minerals, Metals and Materials Society
J. H. Meza V
Organization:
The Minerals, Metals and Materials Society
Pages:
7
File Size:
173 KB
Publication Date:
Jan 1, 1993

Abstract

La Caridad operated at only 65% of design capacity during the first five years of operation. After the first major shutdown and repairs to the furnace in mid- 1992, the smelter quickly reached 95% of design capacity. Converter operation is now more efficient; blowing times have decreased from about 1.7 to 1.2 min/ton of matte. Anode copper production is now 15000 tons/month. The increased efficiency provided by better coordination and scheduling ensures La Caridad's ability to operate at present and expanded production capacity while simultaneously meeting environmental control standards.
Citation

APA: J. H. Meza V  (1993)  Current Operation at La Caridad Smelter

MLA: J. H. Meza V Current Operation at La Caridad Smelter. The Minerals, Metals and Materials Society, 1993.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account