Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project

The Australasian Institute of Mining and Metallurgy
Johns A. L
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
11
File Size:
920 KB
Publication Date:
Jan 1, 1981

Abstract

The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victorian Railways, as well as being the eventual operator of the Loop when it is completed by MURLA, have also been responsible as "Contractors" to MURLA for the construction of the "cut and cover" or "box" tunnels and related approach works located on existing Railway property. These tunnel connections link the existing suburban system to the new underground works. The following tabulation indicates the significant work volume involved in this cut and cover tunnelling exercise and which is covered in some detail by this paper.
Citation

APA: Johns A. L  (1981)  Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project

MLA: Johns A. L Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project. The Australasian Institute of Mining and Metallurgy, 1981.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account