Debismuthising of Lead at the Bhas Lead Refinery, Port Pirie

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 9
- File Size:
- 512 KB
- Publication Date:
- Jan 1, 1985
Abstract
The debismuthising plant, commissioned in 1980, is based on the Kroll-Betterton process for preliminary bismuth removal with subsequent antimony treatment for fine debismuthising. Bullion flowrate is continuous and the plant was designed to achieve low bismuth lead product at rates of up to 20 tonne/h.Development of the first stage of the operation has enabled reliable operations at 25 tonne/h to be achieved. Thesedevelopments also introduced the opportunity to treat higher bismuth bullion at up to 35 tonne/h when operating the first stage only to produce product lead of 0.029 per cent Bi, meeting the ASTM B29-55 Corroding Lead Standard.
Citation
APA:
(1985) Debismuthising of Lead at the Bhas Lead Refinery, Port PirieMLA: Debismuthising of Lead at the Bhas Lead Refinery, Port Pirie. The Australasian Institute of Mining and Metallurgy, 1985.