Decline Excavation at the Montanore Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 512 KB
- Publication Date:
- Jan 1, 1993
Abstract
This paper will describe the excavation of a 5.4 percent decline at the Montanore Project for Noranda Minerals Corporation. The 5.3 m by 4.9 m tunnel was driven to provide access for the exploration of a major copper-silver deposit. Soft ground and conventional drill-blast mining were used on the 4,270 m tunnel. Ground support consisted of steel sets and concrete in the soft ground and pattern rockbolts providing the majority of the rock support. A special feature of the project was the use of conveyor haulage in conjunction with the drill-blast excavation.
Citation
APA:
(1993) Decline Excavation at the Montanore ProjectMLA: Decline Excavation at the Montanore Project. Society for Mining, Metallurgy & Exploration, 1993.