Delay Blasting Techniques In Open Pit Mines

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 1084 KB
- Publication Date:
- Jan 1, 1981
Abstract
Effective and profitable mining begins with good blasting results. While the importance of sufficient energy to break the rock is recognized, more attention should be paid to the time factor in blasting. Fragmentation, looseness and the shape of the muckpile can be improved and energy levels lowered through the use of proper delays. The long delay is also the most important parameter in establishing stable walls along the final limits of the pit. The time factor in blasting is explained through the rock acceleration process and its practical application is demonstrated by case histories.
Citation
APA:
(1981) Delay Blasting Techniques In Open Pit MinesMLA: Delay Blasting Techniques In Open Pit Mines. Society for Mining, Metallurgy & Exploration, 1981.