Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

Society for Mining, Metallurgy & Exploration
Kathryn Kelly Vojtech Ernst Gall Victor Despointes Chris Feeney Stephane Polycarpe Brian Hann
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
15
File Size:
244 KB
Publication Date:
Jun 13, 2023

Abstract

The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to manage poor ground and water ingress which is launched from within a SEM starter tunnel. The main tunnel connects to four adits along its alignment, three of which are SEM tunnels and one being a MTBM tunnel. This contribution describes the selection process, potential risks, and requirements for the TBM, as well as the design of the main tunnel, the adits, and the adit-bored tunnel connections.
Citation

APA: Kathryn Kelly Vojtech Ernst Gall Victor Despointes Chris Feeney Stephane Polycarpe Brian Hann  (2023)  Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

MLA: Kathryn Kelly Vojtech Ernst Gall Victor Despointes Chris Feeney Stephane Polycarpe Brian Hann Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023. Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account