Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project

Society for Mining, Metallurgy & Exploration
J. Chae D. Pecha R. Andrews
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
5873 KB
Publication Date:
Jan 1, 2005

Abstract

The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the project is the 3100 lineal feet long, 14'-8"diameter 42nd Ave S Storage/Treatment Tunnel. During the course of the project, the owner and consultants evaluated numerous elements of the tunnel including the alignment, geotechnical conditions, tunnel liner, and settlement monitoring requirements. The contractor utilized innovative shaft construction methods for the tunnel portals, and adhered to strict contract requirements in successfully constructing the tunnel. This paper provides an overview of the design and construction elements of the 42nd Ave S Storage/Treatment Tunnel that led to the successful completion of the project.
Citation

APA: J. Chae D. Pecha R. Andrews  (2005)  Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project

MLA: J. Chae D. Pecha R. Andrews Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project. Society for Mining, Metallurgy & Exploration, 2005.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account