Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?

Society for Mining, Metallurgy & Exploration
Tamara Kondrachova Giuseppe M. Gaspari
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
14
File Size:
3653 KB
Publication Date:
Jun 13, 2021

Abstract

Contract practices affect cost and schedule of tunneling works, impacting risk allocation between Owners and Contractors. The Authors compiled a dataset of projects constructed in the Toronto Area between 1990–2020 procured either Design-Build or Design-Bid-Build. Data were analyzed identifying independent cost variables across the two methods. Overall industry efficiency further comparison with historical information demonstrates the costs of engineering ongoing escalation due to rising trends in environmental requirements and public consultations stirred through modern communicative platforms. These hard to predict and estimate costs need to be included in the risks evaluated and managed by Owners and not by Contractors
Citation

APA: Tamara Kondrachova Giuseppe M. Gaspari  (2021)  Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?

MLA: Tamara Kondrachova Giuseppe M. Gaspari Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?. Society for Mining, Metallurgy & Exploration, 2021.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account