Design-Build Synergy To Deliver Pile Foundations

- Organization:
- Deep Foundations Institute
- Pages:
- 6
- File Size:
- 783 KB
- Publication Date:
Abstract
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highway 90 at Louisiana State Highway 85 (US90/LA85) intersection was contracted under the design-build delivery system, in part to take advantage of these efficiencies. As one of five projects recognized by the Design Build Institute of America (DBIA) when it honored LADOTD as its 2011 Transportation Owner of the Year in the highway/bridges category, the design-build method provided a way for this project to be ?shovel-ready?, which enabled the LADOTD to secure American Recovery and Reinvestment Act (ARRA) funding. This paper describes the benefits this project gleaned from the design-build process, which included synergy, schedule, design and construction efficiencies, and team building. Interlaced with design and construction of precast prestressed concrete (PPC) piling in compressible southern Louisiana soils, the design-build process rapidly translated computations to cost and schedule savings. A robust quality assurance program using Pile Driving Analyzer (PDA) equipment to evaluate pile set-up provided expedited acceptance of bridge bents and advanced construction schedule. Data evaluation includes analyses of PDA data obtained from 1-hour, 24-hour, 7-day, 14-day and 6-month restrikes of the project test pile.
Citation
APA:
Design-Build Synergy To Deliver Pile FoundationsMLA: Design-Build Synergy To Deliver Pile Foundations. Deep Foundations Institute,