Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? Introduction

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 30
- File Size:
- 747 KB
- Publication Date:
- Jan 1, 1976
Abstract
Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972. Its concentrator consists of two grinding and flotation circuits in parallel each composed of a 6 000 KW (8,000 HP) 9,75 m (32 foot) diameter by 4,724 m (15'-6") semi-autogenous primary mill feeding two 3 000 KW (4,000 HP) 5,029 m (16.5 foot) diameter by 7,01 m (23 foot) secondary ball mills each feeding a bank of flotation cells. ,The original tailings system picked up the tailings from the flota¬tion circuits in a concrete collection box in the mill and carried the 36% solids density by weight slurry 488 m (1,600LF) through a 1100 mm (42 inch) diameter wood stave pipeline on a .46 percent slope to three 99,06 m (325 foot) diameter center drive thickeners. From the collection box under the thickeners the tailings line con¬sisted of three sections, carrying 50% solids density slurry. The first section consisted of 1460 m (4,800 LF) of 910 mm (36 inch) asbestos cement pipe for gravity flow from the thickener under flow elevation of 1252,4 m (4,109 feet) to the first pump station at elevation 1207,6 m (3,962 feet). Eight concrete drop boxes were used to limit the maximum slope on the pipeline to 0.5 percent.
Citation
APA:
(1976) Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? IntroductionMLA: Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? Introduction. Society for Mining, Metallurgy & Exploration, 1976.