Design of a NATM Tunnel for Mission Valley Light Rail—East Extension

Society for Mining, Metallurgy & Exploration
David Powell David Field Richard Hulsen
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
1273 KB
Publication Date:
Jan 1, 2001

Abstract

The Mission Valley Light Rail will loop through San Diego State University (SDSU)and to minimize the impact of construction most of the works will be underground. The project will require construction of a 330-m long (1080-ft), 11.24-m wide (36.9-ft),single twin track tunnel through Stadium Conglomerate, a poorly cemented dense sandy gravel with cobbles. Key technical issues are discussed including the ground conditions and predicted ground response, the use of sequential excavation methods to control deformations and specific construction concerns such as instrumentation and monitoring. Management of the construction process to minimize risk is particularly important in this environment and the strategy selected to control the works is also considered.
Citation

APA: David Powell David Field Richard Hulsen  (2001)  Design of a NATM Tunnel for Mission Valley Light Rail—East Extension

MLA: David Powell David Field Richard Hulsen Design of a NATM Tunnel for Mission Valley Light Rail—East Extension. Society for Mining, Metallurgy & Exploration, 2001.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account