Design of a NATM Tunnel for Mission Valley Light Rail—East Extension

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 1273 KB
- Publication Date:
- Jan 1, 2001
Abstract
The Mission Valley Light Rail will loop through San Diego State University (SDSU)and to minimize the impact of construction most of the works will be underground. The project will require construction of a 330-m long (1080-ft), 11.24-m wide (36.9-ft),single twin track tunnel through Stadium Conglomerate, a poorly cemented dense sandy gravel with cobbles. Key technical issues are discussed including the ground conditions and predicted ground response, the use of sequential excavation methods to control deformations and specific construction concerns such as instrumentation and monitoring. Management of the construction process to minimize risk is particularly important in this environment and the strategy selected to control the works is also considered.
Citation
APA:
(2001) Design of a NATM Tunnel for Mission Valley Light Rail—East ExtensionMLA: Design of a NATM Tunnel for Mission Valley Light Rail—East Extension. Society for Mining, Metallurgy & Exploration, 2001.