Design of the New Lihir Gold Pressure Oxidation Autoclave

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 10
- File Size:
- 711 KB
- Publication Date:
- Jan 1, 2011
Abstract
Newcrest Mining Limited, originally as Lihir Gold, has operated a pressure oxidation plant for the recovery of gold from refractory ore since 1997. The mine and gold plant are located on Lihir Island in Papua New Guinea. Design of the original pressure oxidation circuit was based on the results of pilot plant tests conducted by Sherritt in Fort Saskatchewan. Following a decision to expand the plant in 2008, Lihir Gold contracted Sherritt to design a new autoclave. The design exercise utilized the original pilot plant test results, commercial process results at Lihir, and an understanding of advances in autoclave technology since the original plant was built. The new Lihir autoclave will be the largest horizontal, multiple-compartment autoclave in the world. The design process for the pressure oxidation expansion is described in this paper.
Citation
APA:
(2011) Design of the New Lihir Gold Pressure Oxidation AutoclaveMLA: Design of the New Lihir Gold Pressure Oxidation Autoclave. Canadian Institute of Mining, Metallurgy and Petroleum, 2011.