Design of the Otjikoto Gold Mill, Namibia "Mining, Metallurgy & Exploration (2021)"

Society for Mining, Metallurgy & Exploration
John Rajala
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
1820 KB
Publication Date:
Oct 30, 2020

Abstract

The Otjikoto Gold Mine in the Republic of Namibia is located approximately 300 kilometers north of the capital city of Windhoek. The project features surface mining with a modern gravity/carbon-in-pulp mill for ore treatment and recovery of gold. Initial mill design capacity was 2.5 million tonne per annum but then expanded after 9 months of operation to 3.1 million tonne per annum. The technical steps to establish the Otjikoto mill design from process selection in the due diligence stage, through flowsheet development in the feasibility study followed by detailed engineering design are reviewed in this paper along with mill performance during start-up and in 2019.
Citation

APA: John Rajala  (2020)  Design of the Otjikoto Gold Mill, Namibia "Mining, Metallurgy & Exploration (2021)"

MLA: John Rajala Design of the Otjikoto Gold Mill, Namibia "Mining, Metallurgy & Exploration (2021)". Society for Mining, Metallurgy & Exploration, 2020.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account