Determination Of Equipment Availability

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 15
- File Size:
- 1715 KB
- Publication Date:
- Jan 1, 1964
Abstract
The Mission Unit of American Smelting and 'Refining Company is located in Pima County, Arizona, approximately twenty miles southwest of the City of Tucson. The Unit consists of an open pit copper mine and concentrator. The concentrate is shipped by rail to Company Smelters at Hayden, Arizona, or El Paso, Texas Mine stripping began at Mission in the fall of 1959, and construction of the 15,000 tons per day concentrator gas started in the spring of 1960, The first ore was treated in mid summer of 1961 and full ore production was reached in August of 1961. At that time over 46,000,000 tons of material had been moved from the pit. Current production (ore and waste) averages over 100,000 tons per day. Total production to date (ore and waste) over 120,000,000 tons.
Citation
APA:
(1964) Determination Of Equipment AvailabilityMLA: Determination Of Equipment Availability. Society for Mining, Metallurgy & Exploration, 1964.