The Deep Ore Zone (DOZ) Mine is PT Freeport Indonesia's (PTFI) newest operation. Production at the mine began in September 2000. The DOZ Mine produces 25 kt/d (27,500 stpd) using mechanized block cave mining methods. The DOZ Mine has several major improvements when compared with previous block cave mines in the district. It has an independent and improved ventilation system, a flexible and efficient truck haulage system, and a more reliable crushing and conveying system. PTFI's copper and gold mining complex is located in the Ertsberg mining district in Irian Jaya, Indonesia (Fig. 1). The Ertsberg district is located in the Sudirman Mountains at elevations from 3,000 to 4,500 m (9,800 to 14,700 ft) above sea level. The topography is extremely rugged and rainfall in the mine area averages 3,000 mm/a (118 in./year). Freeport began production in the district in 1972 when the mill began processing ore from the Ertsberg openpit. Underground mining began in 1980 when the Gunung Bijih Timur-Ertsberg East (GBT) Mine was brought online using block caving methods. In 1991, the GBT Mine reached a maximum production rate of 28 kt/d (31,000 stpd). Ore from the mine was exhausted in 1994. The Intermediate Ore Zone (IOZ) was brought into production in 1994. It, too, used block caving methods and had a design rate of 10 kt/d (11,000 stpd). The IOZ is currently producing at a rate of 21 kt/ d (23,000 stpd). The DOZ was discovered in the mid-1980s by deep drilling from the GBT. The GBT, IOZ and DOZ deposits are all situated in the Ertsberg East Skarn System (EESS). In 1993, the first of several studies was completed that indicated that portions of the DOZ Mine could be economically mined using block caving methods. Limited development was started in 1995. Full-scale development and construction began in late 1997. The crusher and conveying system began operating during the first quarter 2000. The first of two main exhaust shafts has been com¬missioned, along with three of the four new main fans. The second exhaust shaft and fourth main fan will be in service by the end of 2001. Undercutting and production began in September 2000. The DOZ Mine will reach its design production rate of 25 kt/d (27,500 stpd) in 2003. A study is under way to determine if an ultimate production rate of 35 kt/d (38,500 stpd) is feasible.
Citation
APA:
(2001) Developing The DOZ Mine At PT Freeport IndonesiaMLA: Developing The DOZ Mine At PT Freeport Indonesia. Society for Mining, Metallurgy & Exploration, 2001.