Development And Operation Of Tailings Dump Retreatment Facilities At ZC/NBHC

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 306 KB
- Publication Date:
- Jan 1, 1983
Abstract
Although investigations into treatment of Mt. Keast (a hill of tailing) began as early as 1940, it was not until the Imperial Smelting Furnace (I.S.F.) was installed at Cockle Creek by Sulphide Corporation that its treatment became eooncmically feasible. Early investigations and milling operations which began in mid-1976, with their developments are described. Metal recovery involves sulphide flotation, oxide flotation and gravity techniques.
Citation
APA:
(1983) Development And Operation Of Tailings Dump Retreatment Facilities At ZC/NBHCMLA: Development And Operation Of Tailings Dump Retreatment Facilities At ZC/NBHC. The Australasian Institute of Mining and Metallurgy, 1983.