Development And Operation Of Tailings Dump Retreatment Facilities At ZC/NBHC

The Australasian Institute of Mining and Metallurgy
Bertrand D. L
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
306 KB
Publication Date:
Jan 1, 1983

Abstract

Although investigations into treatment of Mt. Keast (a hill of tailing) began as early as 1940, it was not until the Imperial Smelting Furnace (I.S.F.) was installed at Cockle Creek by Sulphide Corporation that its treatment became eooncmically feasible. Early investigations and milling operations which began in mid-1976, with their developments are described. Metal recovery involves sulphide flotation, oxide flotation and gravity techniques.
Citation

APA: Bertrand D. L  (1983)  Development And Operation Of Tailings Dump Retreatment Facilities At ZC/NBHC

MLA: Bertrand D. L Development And Operation Of Tailings Dump Retreatment Facilities At ZC/NBHC. The Australasian Institute of Mining and Metallurgy, 1983.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account