Abstract
"Based on laboratory testwork, a two-stage cleaner / re-cleaner circuit with feed regrind was proposed to replace an existing single-stage middling circuit treating a scavenger concentrate at Inco’s Clarabelle mill. In order to effectively transfer the technology and implement the new flowsheet in the plant, an extensive on-site pilot plant campaign was conducted. After demonstrating the improved metallurgy, the two-stage middlings circuit was successfully implemented at the operation.The present paper describes the on-site pilot plant testwork and the plant metallurgical improvement after implementation of the new middlings circuit. The addition of TETA / Na2S03 greatly enhanced the pentlandite selectivity against pyrrhotite and the two-stage cleaning considerably improved the pentlandite selectivity against rock minerals. The improvement was immediate after the installation of the new middlings circuit. Size by size recovery analysis indicated that a finer regrind would further improve the metallurgy of the new two-stage cleanerhe-cleaner circuit and those modifications are in progress at the mill.INTRODUCTIONThe milling operation at Inco’s Clarabelle mill has been described elsewhere (Kerr and Kipkie, 1985; Agar, 1991). While maximizing the recoveries of chalcopyrite (Cp) and pentlandite (Pn), continuous effort has been directed toward improving pyrrhotite (Po) and rock minerals (Rk) rejection. Inco discovered diethylene triamine (DETA) and triethylene triamine (TETA) (Marticorena, et al., 1994) for pyrrhotite rejection. Falconbridge further improved pyrrhotite rejection using DETA and SO2 (Kelebek, et al., 1995). No special technologies are used in the rejection of rock minerals."
Citation
APA:
(2001) Development of a Two-Stage Middlings Circuit at Inco's Clarabelle Mill PART 2: On-Site Pilot plant Testwork and Full Plant ImplementationMLA: Development of a Two-Stage Middlings Circuit at Inco's Clarabelle Mill PART 2: On-Site Pilot plant Testwork and Full Plant Implementation. Canadian Institute of Mining, Metallurgy and Petroleum, 2001.