Development Of A Water Management Plan For The Proposed Copper Mountain Project - Introduction

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 731 KB
- Publication Date:
- Jan 1, 1981
Abstract
A comprehensive, site specific water management plan is of primary importance to the successful implementation, operation and decommissioning of any mining project. Formulation of a plan requires an orderly planning process consisting of identifying problems, establishing planning criteria based on the guidelines and requirements of regulatory agencies, and an iterative procedure of identifying, investigating, and evaluating plan elements and alternative plans. A typical uranium surface mine operation consists of a mine pit or pits, spoil pile areas, crusher, processing plant, and tailings disposal area. A water control plan addresses the problems of diversion of natural runoff from undisturbed areas around the mine; and diversion, collection, and treatment of runoff from within the mine area. A water control plan is required to determine the location and size of appropriate control and detention structures; their cost; and the schedule for permit activity, design, and construction. The plan must be formulated to meet the requirements of both the State and Federal regulatory agencies.
Citation
APA:
(1981) Development Of A Water Management Plan For The Proposed Copper Mountain Project - IntroductionMLA: Development Of A Water Management Plan For The Proposed Copper Mountain Project - Introduction. Society for Mining, Metallurgy & Exploration, 1981.