Development Of Fast Setting Pumped Foamed Cement Packs

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 7
- File Size:
- 130 KB
- Publication Date:
- Jan 1, 2008
Abstract
Foamed cement packs offer a viable alternative to conventional timber or other forms of packs for permanent underground support. These packs comprise steel mesh and hoop containment with an outer bag for the grout; woven, laminated polypropylene fabric being ideal for the purpose. The grout is supplied in 25kg bags and fed into a purpose ? designed foam placer machine which delivers the foamed grout directly to the packs from 60 metre long delivery hose. Foamed cement grout as a fill material offers attractive properties for support packs, in summary these are: Variable Grout Strength Grout strength is controlled by the grout density being delivered from the placer machine. This can be changed by the machine settings. Strength Development Fast rate of strength development is possible so that support is available quickly. Pack yield The foamed grouts are compressible so that yielding of the grout pack can be achieved without loss of support. Rate of Filling Three sizes of placer machine are available, these use one, two, or three 25kg bags per minute of grout, pack filling time is therefore a matter of minutes, a typical 0.75m diameter pack x 1.2m high taking some 17 minutes to fill. Tests in a 1000 tonne press have confirmed that the above characteristics can be achieved with foamed cement packs at acceptable cost. This will be illustrated in the paper with experience to date.
Citation
APA: (2008) Development Of Fast Setting Pumped Foamed Cement Packs
MLA: Development Of Fast Setting Pumped Foamed Cement Packs. The Southern African Institute of Mining and Metallurgy, 2008.