Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance Trials

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
9
File Size:
519 KB
Publication Date:
Jan 1, 1967

Abstract

Performance trials followed the commissioning of three large mine fans at Mount Isa in 1965. Actual performance characteristics were determined. These were in good agreement with predicted performance. Piezometer rings for volume flow and pressure measurement were calibrated, and the performance of some aerodynamic components of the installation was studied.Test equipment, preparation, and conditions are described.
Citation

APA:  (1967)  Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance Trials

MLA: Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance Trials. The Australasian Institute of Mining and Metallurgy, 1967.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account