Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance Trials

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 9
- File Size:
- 519 KB
- Publication Date:
- Jan 1, 1967
Abstract
Performance trials followed the commissioning of three large mine fans at Mount Isa in 1965. Actual performance characteristics were determined. These were in good agreement with predicted performance. Piezometer rings for volume flow and pressure measurement were calibrated, and the performance of some aerodynamic components of the installation was studied.Test equipment, preparation, and conditions are described.