Diamond Drilling Problems At Rhokana

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 4
- File Size:
- 564 KB
- Publication Date:
- Jan 12, 1954
Abstract
WHEN diamond drilling was introduced in the Rhokana mines in 1939 it was used principally for pillar removal and for completion of the upper portions of shrinkage stopes which were being affected by increasing pressure. This method of drilling long blastholes proved so successful that it was extended gradually to cover stoping, pillar recovery, and hanging cave work. By 1949 virtually all the production of Mindola and Nkana was being obtained by this method. At the present time 87,500 ft are drilled each month by the 80 diamond drills in daily operation. Responsibility for control and issue of diamond drilling equipment and crowns, as well as tabulation of all performance figures, was taken over by a specially formed Roto drill department, which also investigated the problems encountered with this new method. To assist this department a fully equipped test chamber, Fig. 1, was established underground where performances of various types of machines and equipment could be studied under conditions as nearly uniform as possible.
Citation
APA:
(1954) Diamond Drilling Problems At RhokanaMLA: Diamond Drilling Problems At Rhokana. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1954.