Die optimisering van die Sishengroefvervoersisteem

The Southern African Institute of Mining and Metallurgy
deur J. V. D. M. Grimes
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
6
File Size:
1066 KB
Publication Date:
Jan 1, 1984

Abstract

Sishen Iron Ore Mine is one of the largest open-pit mines in the world, and loading and hauling constitutes one of the major cost items on the mine. Because high productivity in loading and hauling results in large financial benefits, the following projects to improve productivity were implemented at Sishen: - a computerized truck-allocation system, - an overhead power-supply system for the dieselelectric driven rear-dump trucks, - an in-pit crusher and a belt-conveyor system. This paper concentrates on the truck-allocation system, with special reference to the improved productivity of loading and hauling resulting from the implementation of this system.
Citation

APA: deur J. V. D. M. Grimes  (1984)  Die optimisering van die Sishengroefvervoersisteem

MLA: deur J. V. D. M. Grimes Die optimisering van die Sishengroefvervoersisteem. The Southern African Institute of Mining and Metallurgy, 1984.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account