Difficult Problems Met in Supplying Raw Material Supply for New Geneva, Utah, Steel Plant

The American Institute of Mining, Metallurgical, and Petroleum Engineers
AIME AIME
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
1
File Size:
103 KB
Publication Date:
Jan 1, 1944

Abstract

AT a recent meeting of the Utah Section. A.I.M.E., P. D. Nielson, general plant superintendent of the new Geneva steel plant at Provo, Utah, spoke on "General Operations of the Geneva Plant." Mr. Nielson explained that the plant was located at Provo, Utah, on account of railroad facilities, the proximity of coal, iron, and limestone, and the nearness of water for operating the plant. Water probably was the most important item in making the decision.
Citation

APA: AIME AIME  (1944)  Difficult Problems Met in Supplying Raw Material Supply for New Geneva, Utah, Steel Plant

MLA: AIME AIME Difficult Problems Met in Supplying Raw Material Supply for New Geneva, Utah, Steel Plant. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1944.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account