Discussion - Scale-Up Relationships In Spodumene Flotation - Mining Engineering, Page 1182, November, 1958, AIME Trans., Vol. 214 – Horst, W. E.

The American Institute of Mining, Metallurgical, and Petroleum Engineers
John Dasher
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
1
File Size:
91 KB
Publication Date:
Jan 6, 1959

Abstract

Getting spodumene to float quickly and cleanly can be a problem. The author has presented an excellent account of a valid and useful approach to the scale-up of such problem floats. This indicated advantages for doubling retention time, i.e., buying another set of flotation cells. The author states that 21 pct of the spodumene floated in 2 min in the laboratory cell, that the grade of the rougher was about 75 pct spodumene, and that the final tailing contained 4 to 12 pct spodumene in different sizes with the present cells and 1 to 9 pct spodumene with twice as many cells.
Citation

APA: John Dasher  (1959)  Discussion - Scale-Up Relationships In Spodumene Flotation - Mining Engineering, Page 1182, November, 1958, AIME Trans., Vol. 214 – Horst, W. E.

MLA: John Dasher Discussion - Scale-Up Relationships In Spodumene Flotation - Mining Engineering, Page 1182, November, 1958, AIME Trans., Vol. 214 – Horst, W. E.. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1959.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account