Dragline Gearbox Filtration: The Proven Solution

Canadian Institute of Mining, Metallurgy and Petroleum
Paul Clayton
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
19
File Size:
1263 KB
Publication Date:
May 1, 2008

Abstract

Case Study ? Site: BMA Saragi Coal Mine Queensland Australia ? Model: Marion 8050 ? YOM: Mid 1970s ? Boom: 97M ? Bucket: Original capacity of 100 Tonnes upgraded to 125 tonnes at time of filtration upgrade. ? Apps: Swing, Hoist & Drag Gearboxes ? Oil: Oil Castrol Alpha TT1200 Viscosity of 1208 cSt @ 40° C (104° F) 720ltr Oil Volume Trial and Installation Justifications ? To reduce gearbox overhauls. Typical schedule being 5 years. ? Bucket upgrade from 100 tonnes to 125 tonnes. Increased gearbox demand and stress. ? Increase of overhauls out to 10 years + ? Saving per Dragline estimated to be US$8-10M in downtime and maintenance if successful. ? In compliance with BHPBilliton Global Maintenance FLAC program ? Fuels, Lubricants, Air and Coolants ? Cost Justification ? Downtime: 4 days ? Lost production: $420,000 ? Cost of parts: $162,000 ? Labour and misc: $41,000 Gearbox failure cost $623,000
Citation

APA: Paul Clayton  (2008)  Dragline Gearbox Filtration: The Proven Solution

MLA: Paul Clayton Dragline Gearbox Filtration: The Proven Solution. Canadian Institute of Mining, Metallurgy and Petroleum, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account