Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. Limited

The Australasian Institute of Mining and Metallurgy
Bradley AJ
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
9
File Size:
275 KB
Publication Date:
Jan 1, 1978

Abstract

Hamersley Iron Pty. Limited mines and pro cesses iron ore from two orebodies at Tom Price and Paraburdoo, situated in the North West of Western Australia. Conventional open pit mining methods are used at both sites in that material is drilled and blasted in benches, loaded by shovels and hauled to the Primary Crushers or dumped on waste or low grade material stockpiles. The present drilling fleet, consisting of eight high capacity Bucyrus Erie Rotary drills has evolved from an initial fleet of a large number of small percussion rigs. There are significant physical differences between the ore types encountered at both mines which nec- essitate the drilling of smaller diameter blast holes at Paraburdoo than those at Tom Price. The drilling practice at each site is dis- cussed, with examples of performance achieve- ments under varying drilling conditions.
Citation

APA: Bradley AJ  (1978)  Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. Limited

MLA: Bradley AJ Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. Limited. The Australasian Institute of Mining and Metallurgy, 1978.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account