Dry Process of Preparing Ilmenite-Containing Ores and Optimisation of Equipment Selection

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
2
File Size:
84 KB
Publication Date:
Jan 1, 2003

Abstract

When mining of ilmenite deposits wet process of preparation is traditionally used. But this method needs large volume of water. The problem of water deficiency is characteristic of many regions of the Republic of Kazakhstan. The Satpayevskoye ilmenite deposit is situated in the East Kazakhstan, its location has problems with water, and the mineralogical composition of rock is unfavourable: rocks contain up to 40 per cent of clays. That is why designers made a decision to use dry process of preparation for processing of these ores. Offered scheme and equipment selection are presented in this paper.
Citation

APA:  (2003)  Dry Process of Preparing Ilmenite-Containing Ores and Optimisation of Equipment Selection

MLA: Dry Process of Preparing Ilmenite-Containing Ores and Optimisation of Equipment Selection. The Australasian Institute of Mining and Metallurgy, 2003.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account