Dulles Corridor Metrorail Extension Project - Tunneling Options for Tysons Corner

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 541 KB
- Publication Date:
- Jan 1, 2008
Abstract
Metropolitan Washington Airport Authority is currently undertaking the first Phase of Metro?s Extension to Northern Virginia. A wide range of tunnel options was considered for the Tysons Corner segment that involves about 20,000 feet of track and four stations. After consideration of many options that involved EPBM single track tunnels, NATM tunnels and large bore tunnel concepts for the entire Tysons alignment, the design now being progressed into construction involves two 520 meter (1,700 feet) long soft ground NATM tunnels with several hundred feet of cut-and-cover construction. The paper discusses the process that led to selection of the short NATM tunnels as the most feasible of the options considered for Tysons.
Citation
APA:
(2008) Dulles Corridor Metrorail Extension Project - Tunneling Options for Tysons CornerMLA: Dulles Corridor Metrorail Extension Project - Tunneling Options for Tysons Corner. Society for Mining, Metallurgy & Exploration, 2008.