Duval Sierrita Corporation - Tucson, Arizona

The American Institute of Mining, Metallurgical, and Petroleum Engineers
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
7
File Size:
245 KB
Publication Date:
Jan 1, 1978

Abstract

Duval Corporation, the copper -producing subsidiary of Pennzoil United, Incorporated, operates two plants south of Tucson, Arizona: Esperanza and Sierrita. The newest, the Sierrita mine and mill, came into full production in 1971 at a rate of 72,000 tpd (now 87,000 tpd) which at that time made it the largest designed copper plant in the world. In 1968, the largest milling units then available were selected; these included fourteen 16$ ft by 19 ft long ball mills (5 m by 5. 9 m), each equipped with a 3,000 hp motor. The primary crushing plant contains two 60 in. by 89 in. Allis- Chalmers gyratories; each is constructed for two-side dumping by 120- and 150-ton trucks. Access to the maintenance areas to service the drive motors, eccentrics, apron feeders, and speedup conveyor is through hatches between the crushers. This area also contains a good- sized elevator and a stairway. The rather shallow dump pocket, the 300 -ton crushed ore pocket, and the overall design make for a fine, compact arrangement for two 60 in. crushers installed in a total height of 89 ft (27. 13 m) from dump level to top-of-concrete at the lowest level beneath the collecting or speedup belt. This efficient layout is reflected in the short changeout time for mantle and concaves (8 and 30 hours respectively) and the low crushing cost of $0.0416 per ton (first half of 1975). The crushers are installed on 64 ft (19.5 m) centers (Bougainville and Palabora, both with 54 in. crushers, are 55 and 43 ft or 16.76 and 13. 1 m respectively). The switchgear room is located between the truck dumping positions on one side of the installation and the hydroset units on the other side, with dust collecting equipment mounted over the latter. Protection of these units from rocks falling from the trucks is provided by concrete walls. Truck dumping is controlled from a central 25 ft high (7.6 m) control room, which permits fine observation of operations. Removal of oversize boulders from the dump pockets is done with a hydraulic grapple or a rock hook or sling attached to the auxiliary crane hook. Spare mantle stands and a maintenance room with a zinc melting furnace are located at one end of the surface facilities. The maintenance room is equipped with an access door for the crane, which is equipped with 80- and 20-ton hoists. The two 84 in. (2. 135 m) apron feeders receiving the 6 in. (152 mm) crushed rock discharge onto a 72 in. (1. 83 m) collecting and wear belt operated at a speed compatible with the 60 in. (1.524 m) takeaway belt running at a speed of 630 fpm (192 mpm). This belt feeds a 54 in.
Citation

APA:  (1978)  Duval Sierrita Corporation - Tucson, Arizona

MLA: Duval Sierrita Corporation - Tucson, Arizona. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1978.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account