Dynamic Programming In Mine Planning And Production Schedulling

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 408 KB
- Publication Date:
- Jan 1, 1992
Abstract
This paper intends to present a general methodology implemented in a software package and which can be applied, whatever the exploitation methods, mining constraints and time basis, to mine planning and production schedulling. Examples are: presented covering the medium-term and short-term planning procedure and the production schedulling for two underground mines located in the South of Portugal (Neves- -Corvo and Aljustrel Mines). Both are complex suiphide orebodies with differ- ent exploitation methods (Neves-Corvo: cut-and-fill; Aljustrel: Long-hole stop- ping).
Citation
APA:
(1992) Dynamic Programming In Mine Planning And Production SchedullingMLA: Dynamic Programming In Mine Planning And Production Schedulling. Society for Mining, Metallurgy & Exploration, 1992.