Earth Pressure Balanced Shield Method - A Newly Developed Tunneling Method For Loose Subaqueous Sandy Soil

Society for Mining, Metallurgy & Exploration
Hisakazu Matsushita
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
380 KB
Publication Date:
Jan 1, 1979

Abstract

1. Introduction This is a report on applications of the earth pressure type balanced shield tunneling projects executed under narrow streets on soft alluvial layers in Japan. Japan is a long island country surrounded by the sea. Steep mountain ranges run along the archipelago and numerous rivers originate from the mountains, leaving only limited areas of flat land along the upper and middle reaches of the streams. The majority of cities in Japan are on soft alluvial layers. Alluvium represents an extremely complex soil formation, sections bordering diluvium being characterized by sharp undulations. Various difficulties are therefore encountered in shield tunneling work undertaken in such ground conditions. Particularly, at work sites lying in an unstable, waterbearing layer with high permeability, shield excavation becomes utterly impossible, hampered by large amounts of underground water as well as land collapsing caused by the water. Even when work can somehow be accomplished by using chemical grouting or by lowering ground water level, which require extra expenses and time, undesirable effects such as ground surface settlement are unavoidable in projects undertaken in the past. The newly developed method allows safe and accurate tunnel excavation at normal speed and without giving any adverse effects on buildings above, even under such unstable ground conditions. An outline of this new method was announced at the "International Tunnel Symposium '78" held in Tokyo, and the method has since been employed in a number of tunneling projects in this country. This report provides further data on the new method with reference to some of those projects, explaining how it allows tunnel excavation with
Citation

APA: Hisakazu Matsushita  (1979)  Earth Pressure Balanced Shield Method - A Newly Developed Tunneling Method For Loose Subaqueous Sandy Soil

MLA: Hisakazu Matsushita Earth Pressure Balanced Shield Method - A Newly Developed Tunneling Method For Loose Subaqueous Sandy Soil. Society for Mining, Metallurgy & Exploration, 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account