Economics Of The Treatment Of Gold Plant Tailings In High Rate Thickeners (a8dd0c9f-cb3e-40a6-ba3f-3d542a0d1f62)

Society for Mining, Metallurgy & Exploration
I. M. Arbuthnot
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
389 KB
Publication Date:
Jan 1, 1991

Abstract

Over the last five years, a large number of small to medium sized carbon-in-pulp gold treatment plants have been built in Australia, most designed to treat between 250,000 -1,500,000 tpa of ore. In many cases, the primary requirement was to get a plant built and operating in a short period of time and at minimal capital cost, relating to the limited capital resources and tight cash flow positions of these relatively small mining companies. Since the inclusion of both pre-leach and tailings thickeners resulted in an obvious and significant capital cost, most plants were built without thickeners, without doing a detailed cost-benefit analysis on their inclusion, However, the increasing use of High Rate Thickener?s (HRT s) in the mineral processing industries resulted in a reassessment, in some cases, because of their considerably lower cost. This reassessment was triggered primarily by the need to conserve water in arid mining areas, where borefields were costly to install and water was limited. It has become apparent, though, since startup and operation of these installations, that the savings in cyanide consumption is also a very significant factor and can be used as a primary justification for the installation of a HRT in many cases.
Citation

APA: I. M. Arbuthnot  (1991)  Economics Of The Treatment Of Gold Plant Tailings In High Rate Thickeners (a8dd0c9f-cb3e-40a6-ba3f-3d542a0d1f62)

MLA: I. M. Arbuthnot Economics Of The Treatment Of Gold Plant Tailings In High Rate Thickeners (a8dd0c9f-cb3e-40a6-ba3f-3d542a0d1f62). Society for Mining, Metallurgy & Exploration, 1991.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account