Effective Management And Risk Prevention While Blasting Inside High Sensitivity Areas - The Case Of The Atherinolakkos Power Plant Extension Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 8
- File Size:
- 2586 KB
- Publication Date:
- Jan 1, 2006
Abstract
PPC (Public Power Corporation) operates a new power plant at the South-West part of Crete. Recently the extension of the Power Plant started. ATHENA SA the main contractor of the project assigned to EXORIXI SA the implementation of a blast vibration monitoring program and prevention-evaluation of risks caused by construction blastings inside or very close to the operating part of the power station. The blasting parameters and characteristic elements that had been evaluated, the measures that had been taken and materialized, the overall risk management and the results of the whole program are presented in this paper.
Citation
APA:
(2006) Effective Management And Risk Prevention While Blasting Inside High Sensitivity Areas - The Case Of The Atherinolakkos Power Plant Extension ProjectMLA: Effective Management And Risk Prevention While Blasting Inside High Sensitivity Areas - The Case Of The Atherinolakkos Power Plant Extension Project. Society for Mining, Metallurgy & Exploration, 2006.