Electric Truck Haulage At Crestmore

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 4
- File Size:
- 604 KB
- Publication Date:
- Jan 4, 1959
Abstract
Over a period of years the Crestmore plant of the Riverside Cement Co. has been supplied with limestone from the Chino limestone bed. The limestone bed dips about 40º and extends 1500 ft along the strike. Thickness of the bed is such that horizontal distance from footwall to hanging wall varies from 400 to 1200 ft. When the new room and pillar mining system was instituted the haulage units used for development were model C Tournarockers. Four of these diesel units were purchased with the idea of using them solely for development work since it was realized that they would have to be supplemented by additional, and perhaps larger haulers.
Citation
APA:
(1959) Electric Truck Haulage At CrestmoreMLA: Electric Truck Haulage At Crestmore. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1959.