Electric Truck Haulage At Crestmore

The American Institute of Mining, Metallurgical, and Petroleum Engineers
Peter B. Nalle
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
4
File Size:
604 KB
Publication Date:
Jan 4, 1959

Abstract

Over a period of years the Crestmore plant of the Riverside Cement Co. has been supplied with limestone from the Chino limestone bed. The limestone bed dips about 40º and extends 1500 ft along the strike. Thickness of the bed is such that horizontal distance from footwall to hanging wall varies from 400 to 1200 ft. When the new room and pillar mining system was instituted the haulage units used for development were model C Tournarockers. Four of these diesel units were purchased with the idea of using them solely for development work since it was realized that they would have to be supplemented by additional, and perhaps larger haulers.
Citation

APA: Peter B. Nalle  (1959)  Electric Truck Haulage At Crestmore

MLA: Peter B. Nalle Electric Truck Haulage At Crestmore. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1959.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account