Emergency Egress/Ventilation Raise Innovations in Directional Raise Boring & Remote Shotcrete Application

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 8
- File Size:
- 1592 KB
- Publication Date:
- May 1, 2002
Abstract
Wardrop Engineering and the Placer Dome?s Campbell Mine Design Team utilized leading edge directional raise boring techniques and an innovative, remote controlled application of steel fibre reinforced shotcrete ground support to achieve improved mine ventilation and a superior, safety focused secondary emergency egress. While more standardized methods may have provided a sufficient solution to either the requirement for a ventilation raise or for a traditional escape ladder way, innovative methodology ensured both objectives were met with a single, enhanced solution. Placer Dome committed to provide a solution that minimized energy consumption, optimized air delivery and facilitated an escape way focused on minimizing the negative physiological aspects associated with mine evacuation. The project was successful in providing a new airway, returning 47 m3/s (100,000 cfm) from the 39 Level to 30 Level, minimizing risk to the raise equipping crew and providing a fully equipped escape hoist. The resulting secure escape environment provided an efficient means of evacuating personnel working at depth without necessitating a potentially dangerous exhausting climb to surface. The project has substantiated, that optimized safety focused design can be achieved without jeopardizing project economics.
Citation
APA:
(2002) Emergency Egress/Ventilation Raise Innovations in Directional Raise Boring & Remote Shotcrete ApplicationMLA: Emergency Egress/Ventilation Raise Innovations in Directional Raise Boring & Remote Shotcrete Application. Canadian Institute of Mining, Metallurgy and Petroleum, 2002.