Energy management system at Falconbridge Limited, Onaping Operation

Canadian Institute of Mining, Metallurgy and Petroleum
B. J. Clauzier D. W. Euler
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
5
File Size:
3778 KB
Publication Date:
Jan 1, 1990

Abstract

"Implementation of an effective energy management system will reduce energy costs without impacting negatively on production.The energy management system must be designed to complement the operation and be integrated with the organization. It must be reliable and easy to use but most important, it must have an accurate and timely feedback reporting system to allow the operation to take appropriate action.Falconbridge Limited was one of the first three companies to be awarded the energy monitoring demonstration program in May 1987. The program is sponsored jointly by the Ontario Ministry of Energy and Ontario Hydro.This paper describes the approach taken by Falconbridge Limited to implement the Onaping Area Energy Management System.IntroductionThe objective of the project was to implement an effective energy management system, capable of reducing energy costs without impacting negatively on production.Energy management systems must be designed to complement the operation and to be integrated with the organization. The system must be reliable and easy to use, but most importantly, it must have an accurate and timely feedback reporting system to allow the operation to take appropriate action."
Citation

APA: B. J. Clauzier D. W. Euler  (1990)  Energy management system at Falconbridge Limited, Onaping Operation

MLA: B. J. Clauzier D. W. Euler Energy management system at Falconbridge Limited, Onaping Operation. Canadian Institute of Mining, Metallurgy and Petroleum, 1990.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account