Engineering Approaches To Rock Mechanics Problems In Longwall Mining

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 39
- File Size:
- 3792 KB
- Publication Date:
- Jan 1, 1971
Abstract
In room and pillar mining a large number of working points are arranged to follow a mining pattern. Geological and roof control problems can be overcome or their effect minimized by varying this pattern. Longwall mining on the other hand, fixes the mining pattern for anyone panel. This aspect of longwall mining leads to constancy, so that a well-conceived organization, ventilation, dust and roof control systems lead to daily repetition and subsequent simplicity of control. All the same, a fixed mining pattern calls for a very careful consideration and selection of design parameters. (Ref. 1.)
Citation
APA:
(1971) Engineering Approaches To Rock Mechanics Problems In Longwall MiningMLA: Engineering Approaches To Rock Mechanics Problems In Longwall Mining. Society for Mining, Metallurgy & Exploration, 1971.