Engineering Research And Development With Respect To J C I Backfill Operations

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 22
- File Size:
- 592 KB
- Publication Date:
- Jan 1, 1988
Abstract
The paper outlines the selection of a dewatered tailings backfill system for the Johannesburg Consolidated Investment Gold Division, and covers the following aspects: (i) 16 Shaft pilot testwork; (ii) engineering design problems relating to the Cooke 3 Shaft backfill operation; (iii) in-line mixing - applications with respect to the Randfontein Estates Gold Mine and Western Areas Gold Mine backfill operations; and (iv) pipeline friction losses.
Citation
APA:
(1988) Engineering Research And Development With Respect To J C I Backfill OperationsMLA: Engineering Research And Development With Respect To J C I Backfill Operations. The Southern African Institute of Mining and Metallurgy, 1988.