EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 571 KB
- Publication Date:
Abstract
The paper describes prediction, control and validation of face pressures, and special TBM features for the bored tunnels of the New Metro Rail City Project, Perth, Australia. The selected EPB-TBM passed below a heritage bridge and the operational Perth Railway station in ground conditions consisting of fully saturated uniform sand combined with shallow overburden and a horizontal alignment radius of only 135m. Therefore, strict control of volume loss, TBM operations and ground movements was vital requiring continuous evaluation and adjustments to TBM operation parameters. The paper discusses the effectiveness of applied TBM face pressures and the used foam/polymer soil conditioning which was measured against achieved volume loss and the predicted range of ground settlements.
Citation
APA:
EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City ProjectMLA: EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City Project. Society for Mining, Metallurgy & Exploration,