Equipment Cost Reporting By Major Component Analysis And Frequency Distribution

Society for Mining, Metallurgy & Exploration
Lorraine Brandt Yde
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
16
File Size:
435 KB
Publication Date:
Jan 1, 1971

Abstract

This paper describes development of a cost report that is descriptive, logically oriented, and concise. Since the costs involved relate to mining, this reporting technique could help bridge any possible communications gap between "mining men" and computer personnel, at the same time giving the computer-oriented mining individual information to assist him in his job performance. As computers become entrenched in the mining world, meaningful report assimilation becomes a major task. No one should be more capable of defining required results than the man requesting a report. If he is able to clearly state his needs and has researched his problem, it will be reflected in the computer output. During 1970, The Anaconda Company's Berkeley Pit Operation, at Butte, Montana, received many different computer-generated equipment cost reports. Up to thirty-six different components for each type (class) of pit equipment contributed cost data to the Berkeley Pit cost system files for both operating and repairs during current month, year-to-date and accumulation-to-date time periods. This reporting approach was taken to facilitate analyzing this voluminous data. SUMMARY A Major Component Cost Analysis (Exhibits 6-A thru 6-C) developed by arranging the top ten operating and repair percentages (component cost divided by total cost) in descending order, and then accumulating these percentages to a possible one-hundred percent. While tabulating the operating and repair cost percentages by equipment unit number in the current month, year-to-date and accumulation-to-date time periods, a frequency chart is constructed for each equipment
Citation

APA: Lorraine Brandt Yde  (1971)  Equipment Cost Reporting By Major Component Analysis And Frequency Distribution

MLA: Lorraine Brandt Yde Equipment Cost Reporting By Major Component Analysis And Frequency Distribution. Society for Mining, Metallurgy & Exploration, 1971.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account