Evolution of Metallurgical Parameters at Mantoverde Heap Leach Operation

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 14
- File Size:
- 470 KB
- Publication Date:
Abstract
Mantoverde is a heap leach-SX-EW plant that was commissioned in December 1995 at a production rate of 42,130 tonnes of copper per year and 5.4 million tonnes of ore per year. Copper production was steadily increased reaching a maximum of 62,239 tonnes in 2012 for an ore throughput of 10,5 million tonnes. In order to get these production and throughput rates, a number of changes have been made in the metallurgical parameters of the plant operation since the start up, among them particle size, heap height, acid addition distribution in curing and leaching solution, leach cycles and pad type. Most of the modifications have been implemented after carrying out extensive column test work programs. The modifications implemented and the results obtained, as well as the test work programs carried out, are discussed in this paper.
Citation
APA:
Evolution of Metallurgical Parameters at Mantoverde Heap Leach OperationMLA: Evolution of Metallurgical Parameters at Mantoverde Heap Leach Operation. The Minerals, Metals and Materials Society,