Excavation Of A Major Tunnel By Double Shielded TBM Through Mixed Ground Of Basalt And Clayey Soils

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 26
- File Size:
- 1261 KB
- Publication Date:
- Jan 1, 1987
Abstract
The construction of a major sewerage scheme requiring 15.3 km of 5.5m excavated diameter tunnel in basalt, mixed and soft ground has been undertaken by the Melbourne and Metropolitan Board of Works. A double shielded Tunnel Boring Machine was selected to excavate 13.7 km of basalt and mixed ground. Advanced methods for recording operational data on the TBM were introduced. Progress to date has shown that the TBM can excavate rock very effectively with a best weekly production of 178.8m; soft ground has been encountered and successfully handled.
Citation
APA:
(1987) Excavation Of A Major Tunnel By Double Shielded TBM Through Mixed Ground Of Basalt And Clayey SoilsMLA: Excavation Of A Major Tunnel By Double Shielded TBM Through Mixed Ground Of Basalt And Clayey Soils. Society for Mining, Metallurgy & Exploration, 1987.