Excavation Problems On E.T.S. - 6 Tunnel

Society for Mining, Metallurgy & Exploration
Roy H. Patten
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
5
File Size:
226 KB
Publication Date:
Jan 1, 1987

Abstract

When driving a shallow soft ground bore, the appearance of surface craters along the tunnel alinement indicates trouble, particularly when a major highway is intersected. During the excavation of a 3.7 m diam tunnel in Seattle, Washington a chemical grouting program was implemented to stabilize soil conditions sufficiently to allow advancement of the mole without loss of ground. Unanticipated mixed face conditions consisting of saturated running sand and some boulder pockets bedded on top of dense glacial till created excavation difficulties. A discussion of problems and corrective measures is presented.
Citation

APA: Roy H. Patten  (1987)  Excavation Problems On E.T.S. - 6 Tunnel

MLA: Roy H. Patten Excavation Problems On E.T.S. - 6 Tunnel. Society for Mining, Metallurgy & Exploration, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account