Exotica

The American Institute of Mining, Metallurgical, and Petroleum Engineers
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
2
File Size:
254 KB
Publication Date:
Jan 11, 1969

Abstract

Stripping of the Exotica open-pit mine, which is proceeding at about 120,000 tpd, is dwarfed by its proximity to the 500-million-ton Chuquicamata tailing pile. The excavating work is being carried on smoothly and efficiently and, as of the end of October, accounts for the removal of 77 million tons of total material of which some 200,000 tons is stockpiled ore. Diamond drilling has outlined an orebody 5900 ft long and 3400 ft wide containing an estimated 153 million tons of ore at 1.35% recoverable copper based on 80 % extraction.
Citation

APA:  (1969)  Exotica

MLA: Exotica. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1969.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account