Expansion of the Rio Tinto Patino Tankhouse at Huelvo

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 19
- File Size:
- 514 KB
- Publication Date:
- Jan 1, 1976
Abstract
The Plant, which was started up in April 1970, was originally designed for a capacity of 40.000 ton of cathodes per annum, using 12 sections, containing 408 cells. Since then the addition of another 8 sections containing 280 cells and using the Reverse Current System has made possible the increased output of 109.000 ton. The quality of the cathodes produced is excellent. The extension of the Electrolytic Refinery, by the introduction of the Reverse Current System, has been a great success and no problem has arisen in the new equipment or in the modifications carried out in the plant. The operation of the plant has improved due to better control procedures.