Experiences from an IREDES Prototype Project Production drilling with Atlas Copco Simba L6C Drill Rig at LKAB Kiruna mine

Canadian Institute of Mining, Metallurgy and Petroleum
Mikael Ramström
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
7
File Size:
162 KB
Publication Date:
May 1, 2003

Abstract

The IREDES Special Interest Group (SIG) for Drill rigs has been active since its inception at MineExpo 2000, in Las Vegas USA. The SIG for drill rigs is responsible for the development of a IREDES Drill rig profile. This includes the exchange of production planning, performance and quality reporting data between various kinds of drill rigs and the databases used by the operating mine. During year 2001 a first draft of the drill rigs profile was jointly prepared by drill rig suppliers, mining companies and third party suppliers and reviewed during several SIG meetings. In mid 2002 the profile was released for prototyping projects and since then, feed back received from these projects has been used as input to the first official IREDES release. LKAB and Atlas Copco decided in 2002 to start an IREDES prototyping project using the Simba L6C production drill rig as target equipment. The goal was to verify the drill rig profile and identify possible problems prior to the official release. This was done by implementing the IREDES prototype version in the LKAB?s production planning system and Simba rig control system. The Simba rig control system was designed to handle drill plan and logging information coming from the mine planning system. In parallel to this the mine production system was adapted for drill plan export and logging data import on IREDES format. This paper presents the most recent results of this prototyping project. Result from late 2002 show that the basic architecture of the drill rig profile works and that a common language for data exchange, IREDES will be a central issue for future mine automation. As a result from this and other IREDES prototyping projects the official IREDES release will be available in 2003. Soon after that release IREDES compliant products can be expected. This will include drill rigs and mine production planning systems.
Citation

APA: Mikael Ramström  (2003)  Experiences from an IREDES Prototype Project Production drilling with Atlas Copco Simba L6C Drill Rig at LKAB Kiruna mine

MLA: Mikael Ramström Experiences from an IREDES Prototype Project Production drilling with Atlas Copco Simba L6C Drill Rig at LKAB Kiruna mine. Canadian Institute of Mining, Metallurgy and Petroleum, 2003.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account