Experiences with Underground Sampling of Emplaced Hydraulic Fill

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
7
File Size:
2402 KB
Publication Date:
Jan 1, 1976

Abstract

The methods and equipment developed and used at the Mount Isa mine to obtain samples of uncemented hydraulic fill lying above major horizontal pillars are described. From existing underground development, samples were obtained at distances up to 50 m, of which up to 30 m was through hard rock. Samples were used to predict fill behaviour as it affected mining security during recovery of the pillars.Specialized equipment for difficult sampling situations and also other sampling exercises are described.
Citation

APA:  (1976)  Experiences with Underground Sampling of Emplaced Hydraulic Fill

MLA: Experiences with Underground Sampling of Emplaced Hydraulic Fill. The Australasian Institute of Mining and Metallurgy, 1976.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account