Extractive Metallurgy Division - Bismuth Recovery at Oroya

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 6
- File Size:
- 612 KB
- Publication Date:
- Jan 1, 1962
Abstract
After a short historical background of the process evolution, this article descvibes present-day plant facilities and operating techniques utilized for high-purity bismuth production. The plant is one of the world's largest, with an annual output of some one million pounds of refined bismutlz. PREVIOUS papers1 written by staff members of Cerro de Pasco Corp. have referred briefly to the production of refined bismuth. Since the Corporation is one of the world's foremost producers of high-purity bismuth, a detailed description of the process for extracting the metal may be of general interest. Following a short historical background of the development of the actual process, this presentation will trace the progress of bismuth from its entry into the primary smelting circuits to its concentration in electrolytic lead cell slimes. Our facilities for the treatment of anode muds will be described and the extractive methods given in some detail, with particular emphasis on the techniques which result in the production of refined metal. HISTORICAL BACKGROUND Shortly after Cerro de Pasco began smelting operations at Oroya, Peru in 1922, it became apparent that the dust carried by copper converter gas contained appreciable amounts of bismuth. Although dust collection efficiency was poor prior to building of the 550-ft stack and installation of the central cottrells in 1938, a large stock of dust was accumulated during the intervening years, having the following approximate composition: Oz. per ton Ag - 11.0 Pct Sn — 0.5 Pct Pb - 49.0 Pct Zn - 6.5 Pct Bi - 2.0 Pct Insol. - 1.5 Pct Cu - 0.7 Pct Fe - 2.3 Pct Sb - 3.0 Pct S - 10.0 Pct As - 7.5 In the mid-1920's, experimental crucible melts of this dust with carbon indicated that most of the bismuth and silver, and some of the lead, could be reduced to a fairly clean bullion. Other products were a small amount of leady copper matte and a slag high in zinc, arsenic, antimony, and lead; this slag contained some tin but only small quantities of silver, bismuth, and copper. After the laboratory results had been confirmed by operation of a small reverberatory, a dust reduction furnace was constructed. The ±10 pct Bi-Pb bullion produced from this operation was stocked until 1930, when an Oroya-designed converter type furnace3 was installed for the elimination of arsenic, antimony, and some lead from the bullion. This process concentrated the bismuth from 10 to about 60 pct. By means of the bismuth process developed4 by W. C. Smith at East Chicago (1909-1914) and the discovery of a method5 for separation of lead from bismuth with chlorine gas in 1929, it became possible to begin production of refined bismuth. Unfortunately, bismuth deleaded with chlorine always contained residual chlorides, and the removal of the chlorides by caustic soda left a lead content of 0.02 to 0.04 pct. This final problem was solved6 by substitution of air-blowing for the caustic treatment, which effectively removed all excess chlorine and gave bismuth which was practically lead-free. In 1934, a pilot electrolytic lead refinery began operations at Oroya. Lead smelting was resumed in 1935 and two years later a 100-ton-per-day lead refinery was put into service. In conjunction with the latter, the present-day Anode Residue Plant was constructed. Until 1940, the plant treated both lead anode slimes and dust reduction bullion. The dust reduction furnace was shut down in that year, and all cottrell dusts (with the exception of the product from the arsenic cottrell) were mixed with pyrite and treated in a Wedge roaster to eliminate all possible arsenic. Calcine from this operation joined the sinter plant feed; hence the bismuth from the copper and lead circuits was collected in the lead bullion and subsequently in lead anode slimes from the electrolytic lead refinery. The latter source has been the only bismuth-bearing material of any consequence entering the Anode Residue Plant from late 1940 to the present. A copper refinery began operating in 1948, and the cell mud from this plant is mixed with lead slimes and processed through the same circuit, though only a small quantity of bismuth is present in electrolytic copper cell residues. BISMUTH INTAKE Present-day routes which are followed by the new bismuth feed from its entry into the primary smelting circuits to its arrival at the Anode Residue Plant are traced schematically in Fig. 1. As illus-
Citation
APA:
(1962) Extractive Metallurgy Division - Bismuth Recovery at OroyaMLA: Extractive Metallurgy Division - Bismuth Recovery at Oroya. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1962.